MULTISYSTEM

RAM 1

RAM 2

Diagonal bracing with wedges

  • produced from 48.3 x 2.0 mm pipe, hot-dip galvanized
  • the length of the concentration is adjusted to the length and height of the scaffolding field
  • to the field length: 3.07 m; 2,57m; 2,07m

Our offer

Check out.